Логотип Актобе нефтепереработка

Reconstruction and modernization of oil product loading and unloading

            In December of the past 2024, at the operating loading and unloading rack of Aktobe Refinery LLP, a radical reconstruction of the top loading scheme was carried out using modernized UNZh6-100AS-01 devices, which made it possible to reduce the loading time of railway tanks (fuel oil M-100) by about half, compared to the previously spent time, and as a result, will lead to an increase in the productivity of the current shipment and will affect the profitability of production.

           An additional unit for draining crude oil from car carriers was also introduced, with simultaneous servicing/draining of three tanker trucks, which also provides for draining more viscous crude prepared hydrocarbons. 

The partnership continues its activities to modernize the plant.

Заказать обратный звонок

Leave your number and we will contact you as soon as possible.

Share this page

Send a request
for a consultation

Leave your number and we will contact you as soon as possible.

Aktobe refinery

Aktobe city,
Sazdinskom C/o, 401 plot